9221554 Crusher Control Unit for ZR420JC
| Part Number | 9221554 |
| Part Name | Control Unit |
| Machine Model | ZR420JC |
| Size(CM) | 32*24*6 CM |
| Weight | 1.3 KG |
Product Description
| Part Number | 9221554 |
| Part Name | Control Unit |
| Brand Name | HITACHI |
| Place of Origin | Japan |
| Delivery Time | 1-3 work days |
| Packaging Type | carton packaging |
Part number 9221554 is the original control unit provided by Hitachi for the ZR420JC large mobile impact crushing station. This component is the core processing unit of the electrical control system of this type of crusher, usually responsible for managing key functions such as driving, lubrication, vibration monitoring, and safety interlocking of the crushing host. Its universal model is usually dedicated to the ZR420JC model. As the "brain" of the crusher host, its hardware interface and internal program are deeply integrated with the crusher's motor, sensors, lubrication system, and other components

This product is an industrial grade embedded control unit, equipped with a silver gray die cast aluminum alloy shell with heat dissipation fins. This design provides excellent electromagnetic shielding, efficient heat dissipation, and strong vibration resistance, which can adapt to the high vibration, high dust and harsh environment of mobile crushing stations in mines and material yards. One side of the shell is designed with a raised installation bracket, which facilitates stable installation inside the electrical control cabinet. The working voltage is usually industrial standard (such as AC220V or DC24V). Its core adopts high-performance industrial microprocessors, supports multiple digital and analog I/O interfaces and industrial bus communication, and realizes real-time monitoring and intelligent control of the operating status of the crushing host. The sturdy metal casing and professional industrial design in the picture are a direct reflection of its high reliability.
Replacement and debugging (professional operation): 1 Safe power-off: Before operation, be sure to cut off the main power supply of the equipment and hang a warning sign. 2. Marking and disassembly: Record the connection positions of all wiring harnesses on the old controller and take photos, then disconnect the wiring harness, remove the fixing screws, and remove the old parts. 3. Installation and wiring: Install the new controller (9221554) in place, ensuring that all wiring harnesses are accurately and securely connected back to the corresponding interfaces according to the original markings. 4. Power on debugging: After restoring power supply, professional technicians must use dedicated debugging software or handheld programmers to set parameters and perform functional tests on the controller, ensuring that it communicates normally with various subsystems of the crusher and controls without errors.
Related Products
Call Us Now
+86 191 2466 1674
Contact Us
+86 191 2466 1674
No. 902, 9th Street, Zhuji International Machinery Parts City, No. 36, Zhuji Road, Tianhe District, Guangzhou
Request An Quote
Request An Quote