0791818 Excavator Control Valve Assembly Kit Hydraulic Valve for Hitachi ZX200
| Part Number | 0791818 |
| Part Name | Control Valve Assembly |
| Machine Model | ZX200 |
| Size(CM) | 2*7*2 CM |
| Weight | 0.1 KG |
Applicable models:ZX200 ZX240-3 ZX330-5G
Product Description
| Part Number | 0791818 |
| Part Name | Control Valve Assembly |
| Brand Name | HITACHI |
| Place of Origin | Japan |
| Delivery Time | 1-3 work days |
| Packaging Type | carton packaging |

The original Hitachi excavator control valve assembly kit (part number: 0791818) is a comprehensive maintenance or replacement component for the main control valve (multi way valve) of Hitachi medium to large excavators. This kit is widely compatible with Hitachi ZX200, ZX210, ZX240, ZX330, ZX450 and other series of excavators, specifically covering common models such as ZX200-3, ZX210LC-3, ZX240-3, ZX330-3, ZX450-3, etc. As an original kit, it may contain key components such as valve cores, valve bodies, seals (O-rings, support rings), springs, etc. for the overall repair or replacement of valve bodies.

The control valve assembly is the "brain" of the excavator hydraulic system, responsible for receiving pilot pressure signals and accurately distributing high-pressure hydraulic oil to various actuators such as the boom, arm, bucket, slewing, and walking. As an assembly kit, it typically includes a complete valve body assembly or critical internal maintenance components, such as valve cores, valve sleeves, precision springs, and a complete set of sealing elements (made of materials such as NBR, PU, PTFE, etc.) for each working pair. Its core function is to achieve on-demand distribution of hydraulic flow, pressure control, merging/splitting, and smooth switching of actions.

The maintenance core of this valve assembly lies in regular monitoring, preventive maintenance, and professional inspection. Daily monitoring: Hydraulic oil cleanliness should be checked every 500 working hours (recommended to meet NAS 1638 level 8 standard), and the pilot filter element and return filter element should be cleaned regularly. Before disassembling the valve body, it is necessary to thoroughly clean the outside and release the system pressure. During major repairs, it is necessary to use specialized tools and refer to the maintenance manual to disassemble, clean, and inspect the fit clearance and wear of each valve core and valve hole in order.
Related Products
Call Us Now
+86 191 2466 1674
Contact Us
+86 191 2466 1674
No. 902, 9th Street, Zhuji International Machinery Parts City, No. 36, Zhuji Road, Tianhe District, Guangzhou
Request An Quote
Request An Quote