4643771 Original Excavator Air Duct for Hitachi ZX200-3

Home > Products > HITACHI > Excavator Spare Parts > 4643771 Original Excavator Air Duct for Hitachi ZX200-3

4643771 Original Excavator Air Duct for Hitachi ZX200-3

Part Number 4643771
Part Name Air Duct
Machine Model ZX200-3
Size(CM) 104*26*20 CM
Weight 4.3 KG

Applicable models:ZX200-3 ZX240-3 ZX270-3

Share:

Product Description

Part Number 4643771
Part Name Air Duct
Brand Name HITACHI
Place of Origin Japan
Delivery Time 1-3 work days
Packaging Type wooden case packaging

Part number 4643771 is the original air conditioning system air duct provided by Hitachi for the ZX200-3 series hydraulic excavator. This component is mainly used for cabin air conditioning or heating systems, and is a key air duct connecting the blower, evaporator/heating core, and air outlet. Its universal models usually cover 20-22 ton models such as ZX200-3, ZX200-5G, ZX210-3, etc., which use the same cab assembly and platform. As the original factory air duct assembly, its bending shape and interface size are precisely matched with the interior trim structure of the cab. It is strictly prohibited to use non-standard auxiliary parts to avoid air loss, airflow noise, or leakage of cold and warm air, which may affect the comfort of the cab.

This product is an injection molded engineering plastic air duct with a complex curved and irregular structure to adapt to the interior space layout of the cab. The material is black ABS or PP engineering plastic, which has the characteristics of light weight, high strength, and aging resistance. The surface may be coated with sound-absorbing or insulation materials to reduce noise and prevent condensation. There are standardized snap on or flange type interfaces at both ends or sides of the air duct, which are used to tightly connect with the air conditioning box and the air outlet grille. Its core function is to construct a sealed air duct system, ensuring efficient and low loss delivery of airflow to designated air outlets, and effectively preventing air leakage and cross flow between different air ducts.

Inspection and Cleaning: It is recommended to inspect every 1000 working hours or every 6 months. The main inspection is to check whether there are cracks or damages in the air duct body, whether the interface buckles are loose, and whether the sealing strips are aging and falling off. When cleaning, the relevant interior cover can be removed, and dust and debris inside the air duct can be removed with low-pressure compressed air or a soft long haired brush. Do not use corrosive cleaning agents or high-pressure water guns. Dismantling and installation: 1 When disassembling, it is necessary to first remove the relevant interior panels, pay attention to the direction of the interface buckles, and avoid using brute force to pull and break the plastic buckles. Before installing the new air duct, ensure that all interface sealing rings (if any) are intact and correctly positioned. 3. Align all buckles and locating pins during installation, and press them evenly by hand until all connection points are securely fastened in place.

Call Us Now

+86 191 2466 1674

Contact Us

Contact Us

+86 191 2466 1674

No. 902, 9th Street, Zhuji International Machinery Parts City, No. 36, Zhuji Road, Tianhe District, Guangzhou

Navigation

Navigation

Request An Quote

Request An Quote

©2025 Guangzhou Herui (XINYA Hitachi) Construction Machinery Co., Ltd. All right reserved Site Map Technical Support: REANOD