4650355 Original Excavator Radiator Core for Hitachi ZX240-3

Home > Products > HITACHI > Excavator Spare Parts > 4650355 Original Excavator Radiator Core for Hitachi ZX240-3

4650355 Original Excavator Radiator Core for Hitachi ZX240-3

Part Number 4650355
Part Name Radiator Core
Machine Model ZX240-3
Size(CM) 133*46*38 CM
Weight 34 KG

Applicable models:ZX240-3 ZX270-3F ZX360W-3

Share:

Product Details

Product Description

Part Number 4650355
Part Name Radiator Core
Brand Name HITACHI
Place of Origin Japan
Delivery Time 1-3 work days
Packaging Type wooden case packaging

 

Part number 4650355 is the original radiator core provided by Hitachi for the ZX240-3 series medium-sized hydraulic excavator. This component is the core heat exchange unit of the engine cooling system. Its universal models usually cover 3/5G series same platform models with similar tonnage and engine power, such as ZX240-3, ZX240-5G, ZX330-3, etc. As the core component of the original heat dissipation module, its external dimensions and interface positions are perfectly matched with the radiator frame and cooling pipelines

This product is a tubular aluminum radiator core, with a rectangular aluminum core body. The interior is composed of multiple rows of flat cooling tubes and wavy heat dissipation fins alternately stacked and welded, forming a huge heat exchange surface area. There are two water collection chambers at each end (usually made of black engineering plastic material), with partitions inside to guide the flow of coolant, and standard inlet/outlet pipe interfaces. Specially designed to match the heat dissipation of the ZX240-3 engine. The working pressure is usually 0.8-1.2 MPa, which can withstand the internal pressure of the cooling system and the corrosion of ethylene glycol based antifreeze. The working temperature range is about -30 ℃ to+120 ℃. Its aluminum material achieves lightweight and excellent thermal conductivity while ensuring strength.

Installation specifications: 1 Cleaning and inspection: Before installation, the entire cooling system pipeline must be thoroughly cleaned, and the fins of the new radiator core must be checked for lodging and the water collection chamber interface for cracks. 2. Replace seals: During installation, all rubber water pipes, clamps, and gaskets connected to them must be replaced. 3. Alignment installation: Place the radiator core smoothly into the frame, ensure that the bottom shock absorber pad is in place, and tighten the fixing bolts in diagonal order and with the specified torque (usually 15-25 N · m). 4. Pipeline connection and exhaust: After connecting all water pipes and adding the specified coolant, the engine must be started and the warm air must be turned on. Run at idle until the thermostat is turned on, repeat the operation to exhaust the air in the system, and finally check the fluid level and replenish it.

Call Us Now

+86 191 2466 1674

Contact Us

Contact Us

+86 191 2466 1674

No. 902, 9th Street, Zhuji International Machinery Parts City, No. 36, Zhuji Road, Tianhe District, Guangzhou

Navigation

Navigation

Request An Quote

Request An Quote

©2025 Guangzhou Herui (XINYA Hitachi) Construction Machinery Co., Ltd. All right reserved Site Map Technical Support: REANOD